Hydrogen Fuel Cell Environmental Simulation Test Scheme
/ /Hydrogen Fuel Cell Environmental Simulation Test Scheme
At present, the economic development model based on the consumption of non-renewable energy based on coal, oil and natural gas has led to increasingly prominent environmental pollution and greenhouse effect. In order to achieve sustainable development of human beings, a harmonious relationship between man and nature has been established. The development of sustainable green energy has become a subject of great concern in the world.
As a clean energy that can store waste energy and promote the transformation from traditional fossil energy to green energy, hydrogen energy has an energy density (140MJ/kg) that is 3 times that of oil and 4.5 times that of coal, and is regarded as a subversive technological direction of the future energy revolution. Hydrogen fuel cell is the key carrier to realize the conversion of hydrogen energy into electric energy utilization. After the goal of carbon neutrality and carbon peak "double carbon" was proposed, it has gained new attention in basic research and industrial application.
Hydrogen fuel cell environmental test chamber of Lab Companion meets: fuel cell stack and module: 1W~8KW, fuel cell engine :30KW~150KW Low temperature cold start test: -40~0℃ Low temperature storage test: -40~0℃ High temperature storage test: 0~100℃.
Introduction of hydrogen fuel cell environmental test chamber
The product adopts functional modular design, explosion-proof and anti-static, and meets the relevant test standards. The product has the characteristics of high reliability and comprehensive safety warning, which is suitable for the test of the reactor and fuel cell engine system. Applicable power up to 150KW fuel cell system, low temperature test (storage, starting, performance), high temperature test (storage, starting, performance), wet heat test (high temperature and humidity
Safety parts:
1. Explosion-proof camera: real-time record the complete test situation in the box, easy to optimize or adjust in time.
2. Uv flame detector: high-speed, accurate and intelligent fire detector, accurate identification of flame signals.
3. Emergency air exhaust outlet: exhaust the toxic combustible gas in the box to ensure the safety of the test.
4. Gas detection and alarm system: intelligent and rapid identification of combustible gas, automatically generate alarm signals.
5. Double parallel single-pole screw mechanism cold unit: It has the characteristics of classification function, large power, small footprint and so on.
6. Gas precooling system: quickly control the gas temperature requirements to ensure cold start conditions.
7. Stack test rack: stainless steel stack test rack, equipped with water cooling auxiliary cooling system.
Fuel cell system test project
Fuel cell system test project |
||
Fuel cell engine air tightness test |
Power generation system quality |
The volume of the battery stack |
Insulation resistance detection |
Starting characteristic test |
Rated power starting test |
Steady-state characteristic test |
Rated power characteristic test |
Peak power characteristic test |
Dynamic response characteristic test |
High temperature adaptability test |
Fuel cell engine system performance test |
Vibration resistance test |
Low temperature adaptability test |
Starting test (low temperature) |
Power generation performance test |
Shutdown test |
Low temperature storage test |
Low temperature start-up and operation procedures |
/ |
/ |
Reactor and module test items
Reactor and module test items |
||
Routine inspection |
Gas leakage test |
Normal operation test |
Allow working pressure test |
Pressure test of cooling system |
Gas channeling test |
Impact and vibration resistance tests |
Electrical overload test |
Dielectric strength test |
Pressure difference test |
Flammable gas concentration test |
Overpressure test |
Hydrogen leakage test |
Freezing/thawing cycle test |
High temperature storage test |
Air tightness test |
Fuel starvation test |
Oxygen/oxidizer deficiency test |
Short-circuit test |
Lack of cooling/impaired cooling test |
Penetration monitoring system test |
Ground test |
Starting test |
Power generation performance test |
Shutdown test |
Low temperature storage test |
Low temperature starting test |
Product applicable standards:
GB/T 10592-2008 High and low temperature test chamber technical conditions
GB/T 10586-2006 Humidity test chamber technical conditions
GB/T31467.3-2015
GB/T31485-2015
GB/T2423.1-2208
GB/T2423.2-2008
GB/T2423.3-2006
GB/T2523.4-2008